Erosion Solution 10

Description

Cable Concrete can be driven on.

Problem: Construct a spillway / access road to an island on the Delaware River able to withstand severe flooding and carry truck traffic.
Solution: Cable Concrete 70
Performance: Installed 4/95, subjected to severe flooding since (6 ft. of water with ice chunks the size of cars rolling over it), Cable Concrete is performing as designed.
Engineer: US Army Corps of Engineers
Location: Port Jervis, NJ.